![]() |
Formwork supplies for concrete construction. | ![]() |
|
![]() |
![]() |
||




Regardless if you want to finish or rectify a form, quickly pour concrete or finish a foundation, R.Désilets tools help you do neat work every time. Of exceptional quality, they will serve you for many years to come.
A device that attaches to the bolt of the panel, used to straighten walls and hold them firmly in place while the concrete is being poured. Simple and sturdy, this winch comes with a 30 foot strap.
8” x 1/2” anchor bolt with bolts and washers.
This tool attaches to the bolt of the panel and allows you to slide in a 2” x 4” or 2” x 6” plank. Essential for a tight fit when two panels are installed one over the other.
Easy to use and very strong.
Holds the wall straight while the concrete is being poured.
This easy to use 5/16” tool attaches to the bolt of the panel and allows you to slide in a vertical 2” x 4” or 2” x 6” plank at the desired height. You can then straighten the wall by tightening the screw on the plank.
Used to rectify and solidify the alignment of part of the formwork.
Metal piece used to straighten and align the panel heads in order to obtain a straight concrete surface.
This tool attaches to the top of the panel on the inside and outside. You can then slide a 2” x 4” plank behind the tip on the outside of the wall and, using a hammer, tighten the plank between the tip and the panel.
Strong and flexible, these are perfect for attaching steel reinforcement.
Come in practical 2 500 piece rolls.
Standard lengths available: 6” and 8”.
Makes a watertight seal between the footing and foundation wall. 50’ or 100’ rolls (standard size).
Quickly fastens to the inside of the formwork for attractive and quality installation.
1/8” steel (heat resistant, recommended by authorities in the field, etc.).
Depth can be adjusted from 8” to 10”.
Compatible with all formwork systems of this type.
Shovels of different shapes and lengths for laying concrete
Helps evenly spread the concrete of the footings for a nice finish.
Used to spread the cement over the desired surface.
Fluorescent powder of excellent quality (Choice of colours and quantities, from 8 oz to 5 lbs).
Securely binds the material to the truck.
Mark the floor without having to bend down.
Can bend and cut reinforcing rods up to 5/8” in diameter. Set to the desired degree.
Tool that makes it much easier to remove corners and panels.
For adjustment and to hold an adjustable corner at the desired angle if needed.
To place an H beam over the panels.
To superpose a panel over another panel.
Part to superpose a panel over another with a rod.
Firmly holds the stacked panels. The notch in the plate keeps the rod from moving, providing alignment and stability.
Quickly and solidly attaches a rope to the top of the panel to align the wall. Prevents you from having to nail the top of the panel, thus increasing its service life.
Used to pick up formwork racks.
Easy to use.
Allows the crane operator to work alone.